Lab E4: Capstone: campus Layer 2
A new building: two distribution switches, two access switches, all blank, and a page of requirements. No steps and no hints: do the tasks in any order. Each is checked against the campus as a whole, and you are finished when all of them are true at the same time.
What you will do
- Names, VLANs and desks
- Between the switches
- Two trees
- Both uplinks earn their place
- Keep it
New in this lab: everything so far.
How it is checked
Each of the 5 tasks is checked on the devices themselves as you finish it: the bench reads how the network is configured and what it does, not what you typed. The lab is done when all 5 pass.
Open the lab benchIt needs a computer: phones and tablets are not supported.
