Lab E20: ENCOR final

The same company as lab E11, and nothing has been kept: six blank devices, two providers, three PCs. The first seven tasks are the ones you did there, and you are doing them again because building it once with the last lab fresh in your mind is not the same as being able to. The six after that are everything since, and they all land on the edge router you have just built: a network is not finished when it forwards packets, it is finished when the right people can get into it, the wrong ones cannot, and it tells somebody when it breaks. No hints. Any order. Done when everything holds at once.

In Daveth Pro (Network)A capstone for the course so far · Four routers, four switches and three PCs · 13 tasks

What you will do

  1. The campus
  2. A gateway for each VLAN
  3. From the campus to the edge
  4. Two providers
  5. The branch, and a private way to it
  6. One company
  7. And in IPv6
  8. Who gets in
  9. What reaches the router
  10. What it records and reports
  11. What it does by itself
  12. A change made as data
  13. Keep it

New in this lab: everything.

How it is checked

Each of the 13 tasks is checked on the devices themselves as you finish it: the bench reads how the network is configured and what it does, not what you typed. The lab is done when all 13 pass.

Open the lab benchIt needs a computer: phones and tablets are not supported.