Lab N10: Capstone: switching

A new office, three blank switches, five PCs, and one page of requirements. No steps this time, and no hints: the tasks can be done in any order, and each one is checked against the network as a whole. Everything asked for here you have done before, one piece at a time.

In Daveth Pro (Network)A capstone for the course so far · Three switches and five PCs · 6 tasks

What you will do

  1. Names and doors
  2. VLANs and desks
  3. Between the switches
  4. The tree
  5. Reach and manage
  6. Keep it

New in this lab: everything so far.

How it is checked

Each of the 6 tasks is checked on the devices themselves as you finish it: the bench reads how the network is configured and what it does, not what you typed. The lab is done when all 6 pass.

Open the lab benchIt needs a computer: phones and tablets are not supported.