Lab C21: Mini-mock 3: software-defined and automation

Northgate Freight again, a few months after you left it. The wide area network is the one you finished in C18 and the campus fabric is the one you built in C19; both controllers are in front of you, and so is the API console. Seven tasks, in any order, none with a hint. Three are done in SD-WAN Manager, two in Catalyst Center, two from the API console. A task is done only while it is true, so a later change that undoes an earlier one shows at once. The addresses, names and accounts are the ones those labs used and are on each controller's own pages.

In Daveth Pro (Network)A capstone for the course so far · · 7 tasks

What you will do

  1. Task 1: branch 300 carries no traffic
  2. Task 2: two paths, everywhere
  3. Task 3: branch 400 must not learn branch 300
  4. Task 4: a third floor, and the building's machines
  5. Task 5: no single switch the fabric depends on
  6. Task 6: two answers a program would want
  7. Task 7: all of it, and the Manager says so

New in this lab: everything so far.

How it is checked

Each of the 7 tasks is checked on the devices themselves as you finish it: the bench reads how the network is configured and what it does, not what you typed. The lab is done when all 7 pass.

Open the lab benchIt needs a computer: phones and tablets are not supported.